The brief

A family with several hours of power cuts a day in summer, whose water pump and fridge had been damaged. The main goal was keeping essentials running through cuts, with lowering the bill second. The air conditioner was deliberately left off the backup supply to keep the battery a sensible size.

How it was done

  1. 01 Essential loads listed and their real consumption measured over a full day
  2. 02 Array sized allowing for Rasht’s cloudy days, not a single sunny day’s output
  3. 03 Pitched roof structure checked and galvanised mounts installed with sealed fixing points
  4. 04 Essential circuits separated onto a sub-board fed from the inverter’s backup output
  5. 05 Changeover and anti-islanding protection installed, with surge arrestors on both DC and AC sides
  6. 06 Tested by deliberately cutting the grid supply and recording backup time under real load

The outcome

Through later cuts the essentials stayed on without interruption, and surges on restore no longer reach the appliances. The single-line diagram and commissioning report were handed over, and an annual service was set up for panel cleaning and connection checks.

Contact

Describe the job and I will take it from there

One short call is usually enough to establish what the work is, how long it takes and roughly what it costs.

Call for an accurate estimate. If I am on a job and miss the call, I ring back as soon as I am off the ladder.